Referenzart: Steam and hot water plants

Major project at FBB Kalksandstein AG in Münchenbuchsee
In the course of the renewal of the sand-lime brick production, STEBATEC AG renewed the steam plant of FBB Kalksandstein AG.  In addition to the burner and the pumps, all measurement and control technology was modernised.
Mobile steam plant, Despraz SA
Despraz SA, a leading company in the field of piping and fittings for boiler plants, would like to expand its stock of mobile steam systems and has found the right partner in STEBATEC AG for the risk management and execution of the EMSR technology.
Steam plant, Migros subsidiary ELSA Estavayer Lait SA
Estavayer Lait SA, or ELSA for short, operates one of the largest dairies in Switzerland in Estavayer-le-Lac. It processes 269 million kilograms of milk a year and employs around 600 people. It has been part of the Migros community since 2003 and is therefore essential for the food supply in Switzerland.
Hot water boiler, Schlachtbetriebe St.Gallen AG (CH)
Since the renovation of the building in 2007, the slaughterhouses of St. Gallen AG (SBAG) have operated three hot water boilers equipped with dual fuel burners. A woodchip boiler was installed during renovation work. In the same stage, the two older boilers were taken out of operation. The third existing boiler, built in 2007, and its control system were getting on in years, which is why renovation was necessary.
Steam network monitoring by means of pressure sensor
Due to vibrations, the pressure switch for monitoring the steam network was repeatedly triggered. This led to the shutdown and standstill of the system. A pressure sensor with an evaluation device was installed instead of the pressure switch.
Greater transparency, security, and flexibility—process optimization redefined
The modernization of the boiler technology and the introduction of the REbella process control system have significantly increased the efficiency and operational safety of the plant in Gamsen.
Intelligent automation for efficient energy production
The waste incineration plant in Basel is operated by IWB, the Basel industrial works. In cooperation with Saacke Switzerland, STEBATEC was able to equip four pilot and support burners of the furnace lines with new control technology for IWB. With new control cabinets, interfaces to the existing process control system and rapid commissioning during the overhaul of the oven lines, the plant was brought up to the latest state of the art.