Application: Water treatment / water purification

In addition to filter and computer systems, our range of products for the purification of mixed wastewater and rainwater includes intelligent control and regulation technology, data communication systems, alarm and process control systems. We are experienced in project planning, construction and service of critical infrastructures according to highest availability and safety standards. Our engineers support you in the evaluation and realisation of tailor-made, cost-optimised and future-proof solutions. With the bundled knowledge of our engineers in the combined use of our products such as ARAbella and STEBalarm, or the pneumatic flow control for flow limitation, potential does not remain unused.

Temporary measurements to collect reliable measurement data.
For temporary measurement campaigns, we provide you with an extensive rental pool of over 50 measuring devices with different nominal diameters and measuring methods. Using modern data transmission technology, all measured values are transferred directly and securely to the online process performance system. You will receive temporary access for the measurement campaign and can view the data online at any time.
Powergrid-independent solids retention at discharge structures
The autarkic screen is driven by the integrated water wheel and can be fully connected to process control systems via mobile radio and monitored in real time. Thanks to the intelligent use of naturally available hydro energy, the entire process does not require a mains power supply.
Verify measurement data through a check
We offer a wide range of services for the carefree operation of your drinking water network. If you suspect that something in the network system is no longer working properly, or simply want a general check of the installations, STEBATEC has just the right offer for you.
Rainwater treatment at the wastewater treatment plant without overloading the combined sewer system
The INKA-controlled road drainage system allows contaminated rainwater to be safely routed to the wastewater treatment plant, while uncontaminated rainwater is routed directly to the separate system/watercourse. The first rainwater that washes off the First-Flush is collected in a storage pipe under the road and retained until the combined sewer system has the hydraulic capacity to safely discharge the volumes to the wastewater treatment plant.
Individual automation for safe and efficient processes.
We support you with risk analyses, electrical, control and energy concepts and individual PLC programming in operation and in the realization of automation projects.
The reliable discharge control for wastewater and rainwater
Precise and easy to maintain throttle system for stormwater tanks and wastewater structures. The fast, almost self-cleaning and remotely controllable butterfly valve with pneumatic actuator is based on the flow measurement integrated in the system and limits the flow to an arbitrarily adjustable quantity. As long as the maximum flow is not reached, the flap remains open, while the flow measurement system measures precisely even when partially filled.
Plant monitoring via camera image directly in the process control system.
Plant monitoring without travel. You can define the intervals at which images are to be saved in addition to the live monitoring. In the process control system there are different tools available for image evaluation, so they can be displayed parallel to the hydrographs or also played as a film in different speeds.
Cleans three times the surface area thanks to innovative rotary drive
STEBAjet as swivelling flushing jet, vortex jet, air jet and jet cleaner At the beginning of the emptying of rainwater tanks, the STEBAjet is started in order to keep solids and pollutants in suspension and to prevent them from remaining at the bottom of the tank. The suspended solids are flushed out of the basin as it empties and are thus transported to the sewage treatment plant.
Ultrasonic transit time difference measurement with dry weather gutter
The TF Stationary Flow Measurement is a calibrated measuring channel for backflow-free flow measurement of wastewater, raw wastewater and rainwater in open channels or open channels.
Proud of our craft!
Day after day, STEBATEC fitters honour our craft by carrying out installations of the highest quality that are a joy to the eye of the professional.
Resistant electrical engineering in wet, corrosive, explosive and aggressive environments
As a licensed electrical installation company, we offer the highest installation quality with special products and equipment for durable and trouble-free installations.
Electrical engineering with practical experience
We are passionately committed to finding the optimal solution. In doing so, the trustful and close cooperation with the operator and planner is particularly important to us. Our company history began back in the 1960s; the large number of projects realised since then has provided us with extensive expert knowledge in industrial automation and electrical planning.