Environmental technology and industrial automation

Innovative solutions in the fields of process control engineering, flow measurement, discharge control, sewer network control, alarm systems.

News

Two days filled with knowledge, discussion, and exciting insights!
Just under 100 participants, engaging technical presentations, and valuable discussions. The program featured current and practical topics such as radon, PFAS, analytical measurement technology, and the Alpine Rhine flood protection project.
This is STEBATEC

Partner for process automation, measurement technology and plant engineering

Fully owned by around 120 employees, STEBATEC is a leading driving force in the European water and wastewater market. Founded in 1990, our history dates back to 1913, when the company Züllig, later STEBATEC Züllig AG, was established. Scheidegger Fernsteuerungen AG, which later became STEBATEC Trinkwasser AG, also has a long tradition dating back to the 1960s.

STEBATEC is characterized by experience and know-how. We are a 70% software company, with additional services in the areas of engineering, product manufacture, installation and customer service. STEBATEC products automate water supply systems, sewage treatment plants, sewer networks and systems for generating industrial heat. From electrical planning, IT, control and instrumentation technology to flow measurement, machines and sensors: STEBATEC has proven itself as a partner for process automation, plant engineering and complete equipment.

Successfully completed

Newest references

Early Detection, Reliable Management: Ensuring Drinking Water Quality Through Smart Monitoring.
The municipality of Klosters relies on modern water quality monitoring stations to monitor its springs. This enables the early detection of changes in water quality through online monitoring, thereby ensuring the reliability of the water supply throughout the entire water distribution network.
Modernization for Greater Efficiency, Safety, and Flexibility in Operations
As part of the construction of the new wood-fired power plant at Schweizer Zucker AG in Aarberg, the boiler house—which is over 100 years old—was extensively modernized. The upgrade of the control systems, safety technology, and boiler systems now ensures greater efficiency, operational safety, and future-proof operations.
Ultrasonic clamp-on technology as a sustainable solution for retrofitted reservoir systems—maximum measurement accuracy without compromising drinking water quality
Non-contact flow measurement for maximum operational reliability. At the Schaanwald Reservoir, state-of-the-art ultrasonic technology ensures precise results—without any intervention in the system.
Greater safety, improved accessibility, and smart control systems at Lake Thun
The Ländte wastewater pumping station has been modernized and now offers improved accessibility and safety. The state-of-the-art control system, featuring the ARAbella Online management system, enables efficient monitoring and intelligent sewer network control. The project lays the foundation for sustainable and future-proof operations.
Greater transparency, security, and flexibility—process optimization redefined
The modernization of the boiler technology and the introduction of the REbella process control system have significantly increased the efficiency and operational safety of the plant in Gamsen.
Talent wanted

Job vacancies

Hier sorgen Sie für Spannung!
An unserem Standort in Brügg BE entwickeln Sie Elektroschemas und Installationspläne, unter Einsatz von diversen CAD- und Office Programmen. Ihr abwechslungsreiches Aufgabengebiet erstreckt sich hierbei von der Planungsphase bis zum Projektabschluss.
Hier sorgen Sie für einwandfreie Installationen!
Werden Sie Teil unseres Teams in Brügg BE und führen Sie Montagen, Installationen, Inbetriebnahmen, Anpassungen und Unterhaltsarbeiten an Maschinen, Geräten, Anlagen und Steuerungen durch. Zum Aufgabengebiet gehört auch die Konfiguration von Messgeräten / Alarmierungsgeräten und Steueranlagen.
Hier bauen Sie Zukunft!
An unserem Standort in Brügg BE bauen Sie elektrische Steuerungen, Maschinen und Apparate. Sie nehmen sie in Betrieb, warten und reparieren diese. Zu den Anlagen erstellen sie Anleitungen und technische Dokumentationen.
Hier programmieren Sie Zukunft!
An unserem Standort in Brügg BE, implementieren Sie Softwarelösungen und entwickeln diese weiter, visualisieren verfahrenstechnische Prozesse, erstellen Anforderungsanalysen, führen Inbetriebnahmen und Tests bei Kunden durch.
Technischer Beruf als ideale Basis für die berufliche Weiterentwicklung
Möchtest Du Deine Lehre am Puls der Technik in Rheineck SG absolvieren? STEBATEC Züllig AG ist ein impulsgebendes Unternehmen im Wasser- und Abwassermarkt mit vielen Auftraggebern der öffentlichen Hand.
Feedback

Comments of our customers

Peter
With the new water quality monitoring station, we have an up-to-date overview of the quality of our springs at all times. Detecting changes early on gives us added peace of mind and allows us to act quickly if necessary.
Peter Marugg
Brunnenmeister
CH-7250 Klosters
DSC_1601
STEBATEC guided us through the entire modernization process as a competent and reliable partner. We particularly appreciated the comprehensive support, the practical collaboration, and the quick, solution-oriented assistance—even when faced with unexpected challenges. Today, we benefit from a more efficient, safer, and more flexible facility.
Christian Marti
Head of Technology & Maintenance Schweizer Zucker AG
CH-3270 Aarberg
Bild_Testimonial
For us, the key advantages were the ease of installation, the ability to provide accurate data at low flow rates, and hygienically sound measurement. The clamp-on technology can also be seamlessly integrated into existing water supply systems.
Georg Matt
Managing Director
FL-9492 Eschen
Bild_Kunde_1
The renovation and technical upgrade of the Ländte wastewater pumping station marked a major step toward the future. The modern control system and user-friendly touch panel not only make operations more efficient but also safer. We were particularly impressed by the well-thought-out implementation of safety measures in the storm water basin area. Our collaboration with STEBATEC was constructive, reliable, and solution-oriented throughout the process.

Ueli Meili
Municipal Worker / Facilities Manager
CH-3652 Hilterfingen
DSC_8432
The modernization of our boiler system and the introduction of REbella have made our steam generation significantly more efficient and flexible. Thanks to automation and improved transparency, we can respond more quickly and plan maintenance in a targeted manner. We have also increased safety standards and reduced operating costs.
Reinhard Kalbermatter
Master locksmith Société Suisse des Explosifs (SSE)
CH-3900 Gamsen
Bild7
Thanks to the new control system, we clean the wastewater as needed, which saves energy and improves quality. For us, this is a big step into the future.
Beat Anderegg
Sewage treatment plant operator
Ebnat Kappel, SG
1000056197
With ARAbella, we have not only received a new control system, but also a platform that supports us throughout the entire operation. The integration of maintenance planning, documentation and process analysis not only makes our work easier, but also more efficient. We can make informed decisions because all the relevant data is available in one place.
Ueli Schwander
Wastewater treatment plant Marthalen
CH-8460 Marthalen
DSC_5936
«We are delighted with the modernisation of the boiler safety and control systems by STEBATEC. The seamless integration of the new systems without any interruption to production was particularly impressive. The high-resolution HMI touch panel and the extended maintenance intervals have significantly optimised our operating processes. We are extremely satisfied with the professional implementation and the excellent customer service»
Jorges Simoes
Infrastructure manager Hugo Reitzel SA
CH-1860 Aigle
Fabrice_Bachmann_li_4639
Stebatec impresses us with its innovations and good service. We particularly appreciate the co-operation with Stebatec's motivated employees, who work with us persistently to find the best solution.
Fabrice Bachmann
Managing Director GVRZ
CH-6314 Unterägeri
Platzhalter Testimonial Foto
STEBATEC Trinkwasser AG proved to be the ideal partner with its expert advice and support during implementation. Replacing the MID measuring point with a clamp-on system ensures the daily availability of precise measured values over a period of 24 hours.
Peter Wigger
Fountain master
CH-6052 Hergiswil
DSC_3839
«The specialists at STEBATEC AG supported us at every point in the project and always fulfilled our wishes with top performance and solutions tailored to us. We are very satisfied with the project execution and look forward to further cooperation with the STEBATEC team.»
Christian Zurbrügg
Foreman FBB Kalksandstein AG
CH-3053 Münchenbuchsee
DSC_4286
«The cooperation with STEBATEC and Saacke has worked smoothly at all times. The new control can be configured easily and quickly via the modern 7 inch HMI touch panel and the monitoring and optimisation via our process control system works excellently. We thank STEBATEC and Saacke for the high-quality order processing.»
Fabian Bron
Head of Maintenance EMSRT | BEIE IWB
CH-4002 Basel
Michael_Baumann_Bild_ARA_Brienz_2
«We were looking for an automation company that does not subordinate our concerns but leaves the freedom of design to the customer - the PCS ARAbella from STEBATEC offers unrestricted access for process optimisation for operators who want it. Menu-driven and safe.»
Michael Baumann
WWTP Brienz wastewater treatment manager
CH-3855 Brienz
Andre
«We are exited about the robust LDM flow measurement and the intuitively operable transmitter. It provides me with all the relevant data precisely at a glance.»
André Eggenschwiler
Operator at ARA Falkenstein
CH-4702 Oensingen
IMG_7192 (2)
Stebatec is very customer-oriented and takes our concerns seriously. The partially filled stationary flow measurement with the ultrasonic transit time difference measurement has proven itself. It delivers precise measured values (1-3% accuracy) and maintenance is also extremely simple thanks to the open design.
Michael Kasper
General Manager wastewater treatment plant Kloten/Opfikon
CH-8152 Glattbrugg
Daniel Disler Werkhofleiter Niederbipp
«The cooperation with the STEBATEC team works very well. They always help me quickly and competently. I am happy to have a contact person for all electrotechnical, IT and control technology questions!»
Daniel Disler
Head of Niederbipp depot
CH-4704 Niederbipp
Hanspeter Sommer, Elektroingenieur Wasserverbund Bern
For us, the Scheidegger damper actuators is the best solution. For all our applications in the primary system with pipes up to DN 1000mm, we always have the same mechanical and electrical interfaces. The fact that even the largest dampers can be operated with a drive of only 24VDC allows us to operate our systems safely even in the event of a power failure without expensive UPS systems.
Hanspeter Sommer
Wasserverbun d Region Bern Project Manager and Electrical Engineer
CH 3007 Bern
Roman Wiget, Managing Director SWG Worben
«Few people are aware of how severely a blackout could affect our society. For around 80 centimes per water user per year, we have now secured our
our supply operations in this regard.»
Roman Wiget
Managing Director Seeländische Wasserversorgung SWG
CH-3252 Worben
img-avatar-mann
«I am glad that we are now at the cutting edge of technology and that we have found a competent contact person for any problems.»
Ter Haar Arjan
Technical manager Schlachtbetriebe AG
CH-9015 St. Gallen
Seewer1
«It's great that the Stebatec staff can access the control system from Brügg and support me,should a problem arise.»
Fritz Seewer
Project Manager Civil Engineering City of Wädenswil
CH-8820 Wädenswil
img-refernz-leittechnik-und-automation
The project realization worked out right away. The enormous willingness to perform, the competence and, ofcourse, the enthusiasm for innovation of the Stebatec employees has really convinced us.
Thomas Weyermann
Managing director of Wasserverbund Seeland AG in
CH-3272 Gimmiz
edit_img_foto_zumbrunn
«The new process control system with its additional tools makes our tasks in sewage plant operation much easier.»
Markus Zumbrunn
treatment plant expert ARA Meiringen
CH-3860 Meringen
kiril-atanasoff-kardjalieff.1024x1024
I am delighted with the reliable measurement data and newly gained hydraulic knowledge at the Korneuburg sewage treatment plant!
DI Dr. Kiril Atanasoff-Kardjalieff
The managing director of the waste water association Korneuburg area
AT-2100 Korneuburg