Complete renovation of the exterior structures as general contractor
STEBATEC equipped the entire sewer network with PNA dynamic flow controllers and flow measurements, which were integrated into the ARAbella process control system via STEBAnet and connected to the INKA sewer network regulation system. Since 2016, the entire ZAO sewer network has been dynamically regulated.