Since the renovation of the building in 2007, the slaughterhouses of St. Gallen AG (SBAG) have operated three hot water boilers equipped with dual fuel burners. A woodchip boiler was installed during renovation work. In the same stage, the two older boilers were taken out of operation. The third existing boiler, built in 2007, and its control system were getting on in years, which is why renovation was necessary.
Individual automation for safe and efficient processes.
We support you with risk analyses, electrical, control and energy concepts and individual PLC programming in operation and in the realization of automation projects.