The Office for Water and Waste of the Canton of Berne obliges the operators of wastewater treatment plants (WWTP) to comply with the discharge conditions for treated wastewater into water bodies even in the event of a power failure. Therefore, the operators of the WWTP must install an emergency power supply that can guarantee the operation of the essential plant components. WWTP Villeret, which treats the wastewater of around 12,000 population equivalents in the municipalities of Renan, Sonvilier, Saint-Imier and Villeret, had to rebuild its electrical systems so that it could disconnect its combined heat and power plant, which runs on sewage and biogas, from the public grid and start it on battery power in emergency operation. Emergency load operation is controlled via the process control system.
Development of automated processes for efficiency and safety
We are specialized in project planning, construction and service of critical infrastructures according to highest availability and security standards. Using complex control technology, algorithms and database-based intelligence, we also develop the optimal automation system for your process.