Defined outflow value Langenburg

Langenburg Success Story

The Oberregenbach sewage treatment plant of the town of Langenburg (D) is located between Stuttgart and Nürnburg and treats the waste wa-ter of about 1,800 inhabitants. Located on the foot of a slope, the water from the storm-water basin runs down a steep canal. Before the STE-BATEC drain controller was installed, the waste water was slowed down by a mechanical scale throttle before it entered the sewage treatment plant. The scale throttle was clogged regularly with theresult that only eight liters a second entered the sewage treatment plant instead of the maximum possible inflow of 35 l/sec and the rest entered the main drain without treatment.