ARA Langnau: replacement of pumping station Marbach control system incl. connection to the ARAbella process control system
ALLinONE control system was installed in just one day. The flexible configuration options make it possible to connect the outstation, including alarms, to the new PLS at WWTP Langnau without the need for complex programming.