WWTP V.O.G, La Verna, Ecublens, sludge treatment

The La Verna wastewater treatment plant in Ecublens FR has already completed several moderniza-tion phases during its almost 30-year collaboration with Stebatec.After this long period of trustful cooperation, the next major project is pending; the expansionof the sewage treatment plant from 22,500 population equivalents (PE) to 50,000 PE. To replace a control system in the ongoing clarification operation requires meticulous planning, ex-tensive preparatory measures and, ultimately, great commitment during the effective conversion phase. This was also the case during the partial conversion project for the sludge drying where Stebatec was responsible for the electrical planning, the switch cabinet construction, the software programming, the on-site reconstruction measuresup to the commissioning.