Complete control replacement in 48 hours

WWTP V.O.G, La Verna, Ecublens, sludge treatment

The La Verna wastewater treatment plant in Ecublens FR has already completed several moderniza-tion phases during its almost 30-year collaboration with Stebatec.After this long period of trustful cooperation, the next major project is pending; the expansionof the sewage treatment plant from 22,500 population equivalents (PE) to 50,000 PE. To replace a control system in the ongoing clarification operation requires meticulous planning, ex-tensive preparatory measures and, ultimately, great commitment during the effective conversion phase. This was also the case during the partial conversion project for the sludge drying where Stebatec was responsible for the electrical planning, the switch cabinet construction, the software programming, the on-site reconstruction measuresup to the commissioning.

Products in use

Individual automation for safe and efficient processes.
We support you with risk analyses, electrical, control and energy concepts and individual PLC programming in operation and in the realization of automation projects.
Electrical engineering with practical experience
We are passionately committed to finding the optimal solution. In doing so, the trustful and close cooperation with the operator and planner is particularly important to us. Our company history began back in the 1960s; the large number of projects realised since then has provided us with extensive expert knowledge in industrial automation and electrical planning.
Proud of our craft!
Day after day, STEBATEC fitters honour our craft by carrying out installations of the highest quality that are a joy to the eye of the professional.
Resistant electrical engineering in wet, corrosive, explosive and aggressive environments
As a licensed electrical installation company, we offer the highest installation quality with special products and equipment for durable and trouble-free installations.