Under the Matterhorn
The Zermatt sewage treatment plant, which was built underground in rock caverns, was completely rehabilitated, almost doubling its biological treatment capacity. From the mandate of electrical planning and execution, a close cooperation developed, which today covers the entire measurement and control technology.
Tasks
Analysis of the existing plants and equipment
Development of an overall EMSR concept
Preparation of cost estimate
Complete EMSR planning
Site management: electrical installations, switchgear and control systems, measurement technology
Initial situation / existing situation
In 2008, Ryser Ingenieure AG, which was commissioned with the renovation of the Zermatt wastewater treatment plant, called in STEBATEC AG for the electrical planning.