Case Study: Aarberg Sugar Factory

A historic boiler house is being transformed into a smart energy facility

How do you modernize a boiler house that’s over 100 years old and bring it up to today’s standards? Together with our client, Schweizer Zucker AG, we successfully met this challenge in Aarberg.

Two high-pressure boilers were extensively modernized, and the control, automation, and process control systems were brought up to the latest standards. In addition to integrating existing systems, the focus was on operational safety, efficiency, and flexibility.

The result:
✅ higher energy efficiency
✅ greater operational safety
✅ optimized operational processes
✅ future-proof plant operation

Thanks to close collaboration and solution-oriented planning, the modernization was successfully implemented during ongoing operations despite a tight timeline.

A project that demonstrates: Even historic industrial facilities can be successfully prepared for the future.

Read the project report now